Proyecto Conservación vial, zona 2-4, ruta N° 21, Nicoya -Pueblo viejo
Loading...
Date
Authors
Chaverri Jiménez, Jenny
Rodríguez Castro, Ellen
Morales Granados, Guillermo
Journal Title
Journal ISSN
Volume Title
Publisher
Laboratorio Nacional de Materiales y Modelos Estructurales (LanammeUCR)
Abstract
El señalamiento preventivo es colocado en este frente de trabajo se debe reforzar.
En las proximidades a la zona donde se realizaban las actividades de colocación de mezcla asfáltica había únicamente dos señales preventivas, al inicio y al final. No se contaba con cantidad de conos suficientes que delimitaran la zona de trabajo.
El riego de liga colocado no es uniforme.
El riego de liga colocado previo a la colocación de la mezcla asfáltica no es uniforme y parte del mismo ha sido desplazado por el equipo de construcción empleado en este frente de trabajo, lo que puede favorecer el desprendimiento de la mezcla recientemente colocada.
The preventive signaling is placed on this front of work should be reinforced. In the vicinity of the area where the asphalt mix placement activities were carried out, there were only two preventive signs, at the beginning and at the end. There were not enough cones to delimit the work area. The irrigation of the placed league is not uniform. The watering of the gauge placed prior to the placement of the asphalt mixture is not uniform and part of it has been displaced by the construction equipment used in this work front, which may favor the detachment of the recently placed mixture.
The preventive signaling is placed on this front of work should be reinforced. In the vicinity of the area where the asphalt mix placement activities were carried out, there were only two preventive signs, at the beginning and at the end. There were not enough cones to delimit the work area. The irrigation of the placed league is not uniform. The watering of the gauge placed prior to the placement of the asphalt mixture is not uniform and part of it has been displaced by the construction equipment used in this work front, which may favor the detachment of the recently placed mixture.
Description
Keywords
riego de liga, mezcla asfáltica, señales preventivas, league irrigation, asphalt mixing, preventive signals
Citation
https://www.lanamme.ucr.ac.cr/repositorio/handle/50625112500/1138